SP90Y pipelayer for natural gas pipeline laying in Mexico

  • Machine type:Pipelayer
  • Project type: Road Constructions
  • Construction date:2016.10.21
  • Working condition:Pipeline laying
wer

Natural gas pipeline laying operation within Mexico territory. The Mexico territory contains numerous mountains and hills and the soil texture is mostly rock, with the maximum gradient up to 35° in the mountainous region. SP90Y pipelayer is equipped with heavy-duty tracks to achieve reasonable gravity center layout of machine and excellently complete the 125km pipeline construction under this mountainous working condition.